News
24 Apr 2018

Barossa Offshore Project enters Front-End Engineering Design (FEED) phase

The Barossa joint venture, consisting of ConocoPhillips Australia Exploration Pty Ltd (ConocoPhillips), SK E&S Australia Pty Ltd and Santos Offshore Pty Ltd, have approved entering the FrontEnd Engineering Design (FEED) phase on the Barossa Offshore Project.

Barossa is an offshore gas and light condensate project that proposes to provide a new source of gas to the existing Darwin LNG facility, subject to suitable commercial arrangements being put in place. The offshore development concept includes a Floating Production Storage and Offloading (FPSO) facility, subsea production system, and gas export pipeline, located in Commonwealth waters about 300kms north of Darwin. The existing Darwin LNG infrastructure owners are assessing several options to backfill the facility from 2023 when the current offshore gas supply from Bayu-Undan is expected to be exhausted.

Read the full media release on Barossa Offshore Project enters Front-End Engineering Design (FEED) phase (pdf 42KB)